When planning to set up a site for high-performance computing (HPC) or data center infrastructure, the total cost per megawatt (MW) can vary significantly. The range of **$15,000 to $35,000 per MW** is a good estimate for foundational and preparatory work. However, the actual costs will be driven by several key factors. Below is a detailed breakdown of cost drivers for infrastructure development, with estimates based on typical construction and site-specific variables.
### 1. **Fencing**
- **Purpose**: Security is crucial for data centers and HPC sites to prevent unauthorized access.
- **Cost Range**: $5,000 to $20,000 per MW.
- **Cost Drivers**:
- **Type of fencing** (e.g., chain-link, reinforced, or security fencing with surveillance tech).
- **Perimeter size**: Larger sites will need more fencing.
- **Security features**: Adding gates, access control systems, barbed wire, or security cameras will increase costs.
### 2. **Land Leveling, Backfilling, and Compaction**
- **Purpose**: The terrain must be suitable for large-scale infrastructure, which often requires leveling, backfilling low-lying areas, and compacting the soil to ensure the ground can support heavy equipment and structures.
- **Cost Range**: $8,000 to $15,000 per MW.
- **Cost Drivers**:
- **Type of terrain**: Rocky, hilly, or uneven terrain requires more excavation and backfilling, increasing costs.
- **Soil quality**: Poor soil requires more work to stabilize (e.g., compaction or reinforcement).
- **Remote location**: The farther away the site is from major cities or towns, the higher the transportation and labor costs for this task.
### 3. **Design Works and Permitting**
- **Purpose**: Ensures that the site complies with legal and regulatory requirements and that the design meets the client's and local standards.
- **Cost Range**: $2,000 to $10,000 per MW.
- **Cost Drivers**:
- **Complexity of design**: Custom, tailor-made facilities for high-tech applications (like HPC containers) may require specialized designs, increasing costs.
- **Permitting complexity**: Remote or environmentally sensitive areas may require special permits (e.g., environmental impact assessments), increasing both the cost and the time required for approvals.
### 4. **Fire Safety Systems**
- **Purpose**: Fire safety is essential for compliance and to protect valuable equipment and infrastructure.
- **Cost Range**: $1,000 to $5,000 per MW.
- **Cost Drivers**:
- **Fire suppression technology**: Systems like gas suppression (CO2 or FM200) and water mist are more expensive than standard sprinkler systems.
- **Building requirements**: Data centers often require specialized fire prevention measures due to the concentration of electrical equipment.
### 5. **Network Infrastructure**
- **Purpose**: Data centers and HPC containers require robust network infrastructure, including fiber-optic cables, switches, and connections to ISPs.
- **Cost Range**: $5,000 to $15,000 per MW.
- **Cost Drivers**:
- **Proximity to existing network infrastructure**: Remote sites may need more investment to connect to major network lines, increasing costs.
- **Bandwidth requirements**: High-performance sites may require more expensive high-capacity networking systems, particularly if data transfer needs are substantial.
### 6. **Construction Insurance**
- **Purpose**: Insurance is necessary to cover risks associated with the construction of large infrastructure projects.
- **Cost Range**: $500 to $2,000 per MW.
- **Cost Drivers**:
- **Location**: Projects in remote or challenging environments can have higher premiums due to increased risks (e.g., natural disasters, labor availability, transportation of materials).
- **Project size**: Larger projects with complex designs or multiple contractors may require more comprehensive coverage.
### 7. **Foundations**
- **Purpose**: Ensures that the infrastructure has a stable base, which is critical for long-term durability and performance.
- **Cost Range**: $10,000 to $20,000 per MW.
- **Cost Drivers**:
- **Type of foundation**: Simple slab foundations are less expensive, but specialized foundations, such as those needed for seismic reinforcement or heavy equipment, are costlier.
- **Soil and terrain conditions**: Sites with poor soil may require deeper foundations or reinforced concrete to support the structure, increasing costs.
---
### **Additional Considerations:**
- **[[Power Infrastructure]]**:
- **Cost Range**: $70,000 to $200,000 per MW (already mentioned in the previous section).
- The proximity to the power grid, voltage levels, and transformer capacity can heavily impact the cost of building out power infrastructure.
- **Cooling Systems**:
- **Cost Range**: $50,000 to $200,000 per MW, depending on whether you're using standard air cooling or more complex solutions like liquid cooling.
- Non-redundant cooling is less expensive but offers less reliability, while redundant systems provide higher reliability at greater cost.
- **Customization**:
- **Cost Range**: Varies depending on the needs of the client (e.g., custom HPC containers for GPUs may be priced higher due to special cooling and containment needs).
- Tailored designs for specific server racks or GPU clusters will increase costs significantly beyond off-the-shelf solutions.
---
### **Overall Cost Range per MW**:
Based on the factors outlined above, the total cost per MW can vary widely:
- **Low-end estimate**: Around **$15,000 per MW**, where minimal site preparation is required, standard fencing and infrastructure are used, and the site is near major utilities.
- **High-end estimate**: Upwards of **$35,000 per MW**, where extensive land leveling, complex fire safety, advanced cooling, and custom network infrastructures are necessary.
### **Conclusion**:
The cost drivers for building out HPC or data center infrastructure depend heavily on the local terrain, the remoteness of the site, and specific client requirements. Flexibility and customization in areas like cooling, networking, and fire safety can significantly impact the overall budget. By understanding these cost drivers, it’s easier to estimate the total capital investment needed to develop robust, secure, and high-performing facilities.